Built for sites where gas procurement is a line item, not an afterthought
Reclaimed CO2 is reused directly in your production or blasting process instead of being purchased again, the more you run, the more this offsets.
Recovering and reusing CO2 cuts the volume vented to atmosphere from continuous production or blasting operations.
These are facility-scale systems requiring 380–400VAC three-phase supply, plant access and site preparation, not plug-in workshop equipment.
Recovery units pair with pelletising and production equipment to build a closed-loop, on-site dry ice supply chain.
CO2 recovery systems, by capacity
All three are three-phase industrial installations. Site assessment — including power supply, access and pad requirements is part of every quote.

RDI RE160
Entry point for facilities beginning on-site CO2 recovery at production scale.

RDI RE320
Mid-capacity system for established multi-shift production or blasting operations.

RDI RE600
High-capacity system for continuous, high-volume enterprise production sites.
Considering on-site CO2 recovery?
Tell us your current gas consumption and site power supply, and we’ll assess which system if any makes sense for your scale.
Request a Site Assessment